Loading company filing…
Find a company. Follow its revenue through costs and profit.
Coverage includes separate ticker and security records; counts are not unique companies.
Sankey diagram of MasTec, Inc.. A complete text table follows the diagram.
The infrastructure contractor's next eighteen months are increasingly shaped by power delivery, renewable projects, and large energy-system construction.
Swipe to explore
The Sankey maps reported backlog, not current revenue. Backlog estimates can change through project timing, scope changes, cancellations, and new awards.
Labels and narrative explain the filing. A category marked “arithmetic bridge” or “residual” is calculated from reported totals, rather than a separately reported line.
| Category | Stage | Value | Notes |
|---|---|---|---|
| Communications | 1 | $5.5B | Fiber, wireless and install-to-home |
| Clean Energy and Infrastructure | 1 | $7.3B | Renewables and civil infrastructure |
| Power Delivery | 1 | $6.2B | Transmission and distribution grid |
| Pipeline Infrastructure | 1 | $1.3B | Pipeline and industrial construction |
| Estimated 18-month backlog | 2 | $20.3B | Contracted infrastructure work queue |
| From | To | Value |
|---|---|---|
| Communications | Estimated 18-month backlog | $5.5B |
| Clean Energy and Infrastructure | Estimated 18-month backlog | $7.3B |
| Power Delivery | Estimated 18-month backlog | $6.2B |
| Pipeline Infrastructure | Estimated 18-month backlog | $1.3B |