Loading company filing…
Find a company. Follow its revenue through costs and profit.
Coverage includes separate ticker and security records; counts are not unique companies.
Sankey diagram of Makoto Construction CO,Ltd. A complete text table follows the diagram.
High direct costs leave a small gross-profit pool that cannot cover SG&A.
Swipe to explore
Every category amount is a reported EDINET XBRL fact. Nodes described as arithmetic bridges are calculated residuals and do not imply a separately reported filing line.
Labels and narrative explain the filing. A category marked “arithmetic bridge” or “residual” is calculated from reported totals, rather than a separately reported line.
| Category | Stage | Value | Notes |
|---|---|---|---|
| Cost of sales | 1 | 882M | 87.2% of reported total |
| Gross profit | 1 | 130M | 12.8% of reported total |
| Construction sales converted into gross profit | 2 | 1.0B | Reported six-month total · ¥1.0B |
| Operating loss | 2 | 60M | Absolute value of reported operating loss |
| Operating costs & expenses | 3 | 1.1B | Revenue plus reported operating loss |
| From | To | Value |
|---|---|---|
| Cost of sales | Construction sales converted into gross profit | 882M |
| Gross profit | Construction sales converted into gross profit | 130M |
| Construction sales converted into gross profit | Operating costs & expenses | 1.0B |
| Operating loss | Operating costs & expenses | 60M |